Inspection |
1. |
Measure the pressure of high pressure line by measuring voltage output between NO.1 and NO.2 terminals. |
2. |
Inspect the voltage value whether it is sufficient to be regular value or not.
|
3. |
If the measured voltage value is not specification, replace the A/C pressure transducer. |
Replacement |
1. |
Disconnect the negative (-) battery terminal. |
2. |
Recover the refrigerant with a recovery/charging station. |
3. |
Disconnect the A/C pressure transducer connector (3P) (A).
|
4. |
Installation is the reverse order of removal. |
Operation of the Back up warning system
Operating condition
This system will activate when backing up with the ignition switch ON.
If the vehicle is moving at a speed over 10 km/h (6 mph), the system may not
be activated correctl ...
Main fuse and multi fuse
If the main fuse and multi fuse is blown, it must be removed as follows:
1.Disconnect the negative battery cable.
2.Remove the nuts shown in the picture above.
3.Replace the fuse with a new one o ...