Inspection |
1. |
Turn the ignition switch OFF. |
2. |
Disconnect the PCSV connector. |
3. |
Measure resistance between the PCSV terminals 1 and 2. |
4. |
Check that the resistance is within the specification.
|
Removal |
1. |
Turn the ignition switch OFF and disconnect the battery negative (-) cable. |
2. |
Disconnect the purge control solenoid valve connector (A). |
3. |
Disconnect the vapor hoses (B) from the purge control solenoid valve. |
4. |
Remove the valve from the bracket in the direction of the arrow. |
Installation |
|
|
|
1. |
Installation is reverse of removal.
|
DBC Switch: Repair procedures
Inspection
1.
Turn ignition switch OFF and disconnect the negative (-) battery cable.
2.
Remove the crash pad side switch assembly.
3.
Check the continuity between the switch terminals as ...
Power Mosfet: Repair procedures
Inspection
1.
Ignition "ON"
2.
Manually operate the control switch and measure the voltage of blower motor.
3.
Select the control switch to raise voltage until high speed.
Specification
...