Inspection |
1. |
Turn the ignition switch OFF. |
2. |
Disconnect the OCV connector. |
3. |
Measure resistance between the OCV terminals 1 and 2. |
4. |
Check that the resistance is within the specification.
|
Removal |
[Bank 1 / Intake] |
1. |
Turn the ignition switch OFF and disconnect the battery negative (-) cable. |
2. |
Remove the OTS (A). |
3. |
Disconnect the CVVT oil control valve connector (B). |
4. |
Remove the installation bolt (C), and then remove the valve from the engine. |
[Bank 1 / Exhaust] |
1. |
Turn the ignition switch OFF and disconnect the battery negative (-) cable. |
2. |
Disconnect the CVVT oil control valve connector (A). |
3. |
Remove the installation bolt (B), and then remove the valve from the engine. |
Installation |
|
|
1. |
Installation is reverse of removal.
|
Description and Operation
Description
The starting system includes the battery, starter, solenoid
switch, ignition switch, inhibitor switch (A/T), clutch pedal switch
(M/T), ignition lock switch, connection wires and th ...
PDM Relay Box: Components and Components Location
Components
...